Lakeline Boulevard Extension

As prime consultant, Baker-Aicklen will provide professional engineering and surveying services for the development of design schematics and PS&E to extend Lakeline Boulevard approximately 3 miles from Crystal Falls Parkway (CR 275) to RM 2243 in Williamson County – Precinct 2.  The project is a partnership project between the City of Leander and the County.  Williamson County will pay for the design and construction costs of two lanes of an ultimate four-lane, divided urban arterial. The other two lanes will be built by developers as new projects are constructed in the area. 

 The project limits reside within the Edwards Aquifer Contributing Zone and will require coordination with TCEQ to discuss project scope, expected pollutant loading rates, appropriate permanent controls to meet the water quality requirements of the design drainage area and the development of a Contributing Zone Plan (CZP).  The project scope includes surveying services, preliminary and final design of roadway geometrics, right-of-way and utility coordination, urban storm sewer design, permanent structural water quality and detention controls, culvert analyses, signing and pavement marking plans, storm water pollution prevention plans, traffic control plans and construction sequencing, and utility layouts.